01081

CSMT-DNR SPL (01081)

विशेष
Extra Rush SpecialCR↔ 01082
01081 CSMT-DNR SPL photo 101081 CSMT-DNR SPL photo 201081 CSMT-DNR SPL photo 301081 CSMT-DNR SPL photo 401081 CSMT-DNR SPL photo 501081 CSMT-DNR SPL photo 601081 CSMT-DNR SPL photo 701081 CSMT-DNR SPL photo 8 1 / 8
Representative gallery slideshow
Departure
CSMT
CHHATRAPATI SHIVAJI MAHARAJ TERMINUS
00:30
31 hr 30 minDuration
1,691 kmDistance
54 km/hAvg speed
18Stops
Arrival
DNR
DANAPUR
08:00 +1 day
31 hr 30 minDuration
1,691 kmDistance
54 km/hAvg speed
18Stops
Rake & maintenance
ICF · 20 coaches · 1 rake PM: WB (CR)
Travel classes
SLGEN
Runs on
Wed
Scheduled link Locomotive link
Open live map

Composition

PLANNED
20 Coaches
0
L
1
GEN
2
GEN
3
GEN
4
GEN
5
GEN
6
GEN
7
SLR
8
SLR
9
S1
10
S2
11
S3
12
S4
13
S5
14
S6
15
S7
16
S8
17
S9
18
S10
19
S11
20
S12

18 halts · 232 non-stop stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
CHHATRAPATI SHIVAJI MAHARAJ TERMINUS (CSMT)
00:30
PfMissing?
0 km
6 non-stop stations · 8.9 km at 27 km/hr
DADAR (DR)
00:50 - 00:53
PfMissing?
08.85 km
10 non-stop stations · 24.2 km at 58 km/hr
THANE (TNA)
01:18 - 01:21
PfMissing?
33.02 km
4 non-stop stations · 20.2 km at 42 km/hr
KALYAN JN (KYN)
01:50 - 01:53
PfMissing?
53.21 km
14 non-stop stations · 83.3 km at 54 km/hr
IGATPURI (IGP)
03:25 - 03:30
PfMissing?
136.49 km
5 non-stop stations · 50.6 km at 76 km/hr
NASIK ROAD (NK)
04:10 - 04:13
PfMissing?
187.06 km
7 non-stop stations · 73.1 km at 77 km/hr
MANMAD JN (MMR)
05:10 - 05:15
PfMissing?
260.16 km
19 non-stop stations · 183.9 km at 68 km/hr
BHUSAVAL JN (BSL)
07:57 - 08:03
PfMissing?
444.10 km
16 non-stop stations · 123.5 km at 47 km/hr
KHANDWA JUNCTION (KNW)
10:40 - 10:45
PfMissing?
567.57 km
18 non-stop stations · 177.5 km at 58 km/hr
ITARSI JN (ET)
13:50 - 13:55
PfMissing?
745.11 km
25 non-stop stations · 245.1 km at 67 km/hr
JABALPUR (JBP)
17:35 - 17:40
PfMissing?
990.25 km
10 non-stop stations · 90.7 km at 54 km/hr
KATNI (KTE)
19:20 - 19:25
PfMissing?
1080.92 km
9 non-stop stations · 98.2 km at 65 km/hr
SATNA (STA)
20:55 - 21:00
PfMissing?
1179.12 km
24 non-stop stations · 169.7 km at 47 km/hr
PRAYAGRAJ CHHEOKI (PCOI)
00:35 - 00:40
PfMissing?
1348.85 km
19 non-stop stations · 144.0 km at 37 km/hr
PT.DEEN DAYAL UPADHYAYA JN. (DDU)
04:35 - 04:40
PfMissing?
1492.85 km
19 non-stop stations · 89.8 km at 84 km/hr
BUXAR (BXR)
05:44 - 05:49
PfMissing?
1582.63 km
18 non-stop stations · 68.6 km at 81 km/hr
ARA (ARA)
06:40 - 06:45
PfMissing?
1651.26 km
9 non-stop stations · 39.4 km at 32 km/hr
DANAPUR (DNR)
08:00
PfMissing?
1690.66 km

Review 01081 CSMT-DNR SPL

Share helpful journey details with fellow travellers.

Stars

Traveller reviews

No ratings or reviews yet. Be the first to share your experience.

Train FAQs

What is the schedule of CSMT-DNR SPL (01081)?

CSMT-DNR SPL (01081) runs from CHHATRAPATI SHIVAJI MAHARAJ TERMINUS to DANAPUR. Check the timetable above for every scheduled stop.

What is the route of CSMT-DNR SPL (01081)?

CSMT-DNR SPL (01081) connects CHHATRAPATI SHIVAJI MAHARAJ TERMINUS and DANAPUR. The complete stop-by-stop route is listed in the timetable above.

On which days does CSMT-DNR SPL (01081) run?

CSMT-DNR SPL (01081) runs on Wed.

What is the coach composition of CSMT-DNR SPL (01081)?

The composition section above shows 20 coaches for CSMT-DNR SPL (01081).