Indian Railways train

07227 GNT-VKB TOD SPL

ग्न्त् व्क्ब् तोद् स्प्ल्
TypeExtra Rush Special
RailwaySCOR
Return07228
Representative Indian Railways gallery image photo 1Representative Indian Railways gallery image photo 2Representative Indian Railways gallery image photo 3Representative Indian Railways gallery image photo 4Representative Indian Railways gallery image photo 5Representative Indian Railways gallery image photo 6Representative Indian Railways gallery image photo 7Representative Indian Railways gallery image photo 8 1 / 8
Representative gallery slideshow

07227 GNT-VKB TOD SPL route overview

Departure
GNT
GUNTUR JN
21:45
Arrival
VKB
VIKARABAD JN
05:00 +1 day
7 hr 15 minDuration
347 kmDistance
48 km/hAvg speed
9Stops

07227 GNT-VKB TOD SPL runs from GUNTUR JN (GNT) to VIKARABAD JN (VKB), covering 347 km in approximately 7 hr 15 min. It operates on Sun.

Rake & maintenance
ICF · 24 coaches · 1 rake PM: GNT (SCOR)
Travel classes
GENSL3A2A
Runs on
Sun
Running
Of 30 Aug, has passed Srirampuram at 01:59 (37 min late).
Usually hauled by WAP4 / Vijayawada
1 observed run
WAP4 locomotive

07227 coach composition

CURRENT
24 Coaches
0
L
1
SLRD
2
GEN
3
GEN
4
GEN
5
GEN
6
GEN
7
GEN
8
S1
9
S2
10
S3
11
S4
12
S5
13
S6
14
B1
15
B2
16
B3
17
B4
18
B5
19
A1
20
GEN
21
GEN
22
GEN
23
GEN
24
SLRD

07227 route and timetable

11 halts · 44 non-stop stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
GUNTUR JN (GNT)
21:45
Pf6
0 km
4 non-stop stations · 42.4 km at 59 km/hr
SATTENAPALLE (SAP)
22:28 - 22:30
Pf2
42.37 km
3 non-stop stations · 31.7 km at 68 km/hr
PIDUGURALLA (PGRL)
22:58 - 23:00
Pf1
74.10 km
1 non-stop station · 21.2 km at 58 km/hr
NADIKUDE JN. (NDKD)
23:22 - 23:24
Pf1
95.25 km
3 non-stop stations · 38.6 km at 33 km/hr
MIRYALAGUDA (MRGA)
00:34 - 00:36
Pf1
133.89 km
3 non-stop stations · 38.7 km at 73 km/hr
NALGONDA (NLDA)
01:08 - 01:10
Pf1
172.59 km
10 non-stop stations · 90.6 km at 54 km/hr
CHARLAPALLI (CHZ)
02:50 - 02:52
Pf4*
263.14 km
3 non-stop stations · 11.6 km at 18 km/hr
SECUNDERABAD JN (SC)
03:30 - 03:40
Pf1*
274.69 km
3 non-stop stations · 4.8 km at 26 km/hr
BEGAMPET [D] (BMT)
03:51 - 03:53
Pf*
279.45 km
8 non-stop stations · 18.5 km at 41 km/hr
LINGAMPALLI (LPI)
04:20 - 04:25
Pf1*
297.91 km
6 non-stop stations · 49.1 km at 84 km/hr
VIKARABAD JN (VKB)
05:00
Pf1*
347.04 km

Review 07227 GNT-VKB TOD SPL

Help other passengers with an honest, useful journey review.

No written reviews yet

Be the first traveller to share useful details.

Choose your rating

Traveller experiences

Recent feedback from the RailJournal community.

No traveller stories yetShare the first review for this train.

Train FAQs

What is the schedule of GNT-VKB TOD SPL (07227)?

GNT-VKB TOD SPL (07227) runs from GUNTUR JN to VIKARABAD JN. Check the timetable above for every scheduled stop.

What is the route of GNT-VKB TOD SPL (07227)?

GNT-VKB TOD SPL (07227) connects GUNTUR JN and VIKARABAD JN. The complete stop-by-stop route is listed in the timetable above.

On which days does GNT-VKB TOD SPL (07227) run?

GNT-VKB TOD SPL (07227) runs on Sun.

What is the coach composition of GNT-VKB TOD SPL (07227)?

The composition section above shows 24 coaches for GNT-VKB TOD SPL (07227).