Indian Railways train

08508 VSKP-SHM SUMMER SPECIAL

व्स्क्प्-श्म् सुम्मेर् स्पेसल्
TypeExtra Rush Special
RailwaySCOR
Return08507
Representative Indian Railways gallery image photo 1Representative Indian Railways gallery image photo 2Representative Indian Railways gallery image photo 3Representative Indian Railways gallery image photo 4Representative Indian Railways gallery image photo 5Representative Indian Railways gallery image photo 6Representative Indian Railways gallery image photo 7Representative Indian Railways gallery image photo 8 1 / 8
Representative gallery slideshow

08508 VSKP-SHM SUMMER SPECIAL route overview

Departure
VSKP
VISAKHAPATNAM
11:20
Arrival
SHM
SHALIMAR
03:00 +1 day
15 hr 40 minDuration
879 kmDistance
56 km/hAvg speed
17Stops

08508 VSKP-SHM SUMMER SPECIAL runs from VISAKHAPATNAM (VSKP) to SHALIMAR (SHM), covering 879 km in approximately 15 hr 40 min. It operates on Tue.

Rake & maintenance
LHB · 19 coaches · 1 rake PM: VSKP (SCOR)
Travel classes
GENSL3A2A
Runs on
Tue
Running
Of 01 Sep, has passed Rupsa Jn at 01:52 (3 hr 18 min late).
Usually hauled by WAP7 / Vadodara
1 observed run
WAP7 locomotive

08508 coach composition

CURRENT
19 Coaches
0
L
1
LPR
2
GEN
3
GEN
4
A1
5
A2
6
B1
7
B2
8
B3
9
B4
10
S1
11
S2
12
S3
13
S4
14
S5
15
S6
16
S7
17
GEN
18
GEN
19
SLRD

08508 route and timetable

17 halts · 138 non-stop stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
VISAKHAPATNAM (VSKP)
11:20
Pf8
0 km
2 non-stop stations · 7.9 km at 30 km/hr
SIMHACHALAM [D] (SCM)
11:36 - 11:38
Pf2*
07.90 km
6 non-stop stations · 52.9 km at 84 km/hr
VIZIANAGRAM JN (VZM)
12:16 - 12:18
Pf4
60.79 km
2 non-stop stations · 30.6 km at 74 km/hr
CHIPURUPALLE (CPP)
12:43 - 12:45
Pf1
91.43 km
4 non-stop stations · 38.6 km at 83 km/hr
SRIKAKULAM ROAD (CHE)
13:13 - 13:15
Pf2
130.05 km
8 non-stop stations · 72.8 km at 73 km/hr
PALASA (PSA)
14:15 - 14:17
Pf4
202.89 km
8 non-stop stations · 73.9 km at 70 km/hr
BERHAMPUR (BAM)
15:20 - 15:25
Pf1
276.81 km
10 non-stop stations · 75.9 km at 83 km/hr
BALUGAN (BALU)
16:20 - 16:22
Pf3
352.72 km
13 non-stop stations · 70.9 km at 55 km/hr
KHURDA ROAD JN (KUR)
17:40 - 17:45
Pf2
423.60 km
2 non-stop stations · 18.9 km at 38 km/hr
BHUBANESWAR (BBS)
18:15 - 18:20
Pf1
442.51 km
7 non-stop stations · 27.2 km at 41 km/hr
CUTTACK (CTC)
19:00 - 19:05
Pf2
469.69 km
13 non-stop stations · 72.0 km at 79 km/hr
JAJPUR K ROAD (JJKR)
20:00 - 20:02
Pf2
541.68 km
7 non-stop stations · 43.5 km at 38 km/hr
BHADRAKH (BHC)
21:10 - 21:12
Pf3
585.22 km
9 non-stop stations · 58.9 km at 93 km/hr
BALASORE (BLS)
21:50 - 21:52
Pf3*
644.13 km
17 non-stop stations · 121.0 km at 42 km/hr
KHARAGPUR JN (KGP)
00:45 - 00:55
Pf6*
765.09 km
29 non-stop stations · 108.7 km at 79 km/hr
SANTRAGACHI JN (SRC)
02:18 - 02:20
Pf1*
873.76 km
1 non-stop station · 5.0 km at 8 km/hr
SHALIMAR (SHM)
03:00
Pf2*
878.76 km

Review 08508 VSKP-SHM SUMMER SPECIAL

Help other passengers with an honest, useful journey review.

No written reviews yet

Be the first traveller to share useful details.

Choose your rating

Traveller experiences

Recent feedback from the RailJournal community.

No traveller stories yetShare the first review for this train.

Train FAQs

What is the schedule of VSKP-SHM SUMMER SPECIAL (08508)?

VSKP-SHM SUMMER SPECIAL (08508) runs from VISAKHAPATNAM to SHALIMAR. Check the timetable above for every scheduled stop.

What is the route of VSKP-SHM SUMMER SPECIAL (08508)?

VSKP-SHM SUMMER SPECIAL (08508) connects VISAKHAPATNAM and SHALIMAR. The complete stop-by-stop route is listed in the timetable above.

On which days does VSKP-SHM SUMMER SPECIAL (08508) run?

VSKP-SHM SUMMER SPECIAL (08508) runs on Tue.

What is the coach composition of VSKP-SHM SUMMER SPECIAL (08508)?

The composition section above shows 19 coaches for VSKP-SHM SUMMER SPECIAL (08508).