Indian Railways train

55517 Darbhanga - Jaynagar Passenger

दरभंगा - जयनगर पैसेंजर
TypePassenger
RailwayECR
Return55518
Representative Indian Railways gallery image photo 1Representative Indian Railways gallery image photo 2Representative Indian Railways gallery image photo 3Representative Indian Railways gallery image photo 4Representative Indian Railways gallery image photo 5Representative Indian Railways gallery image photo 6Representative Indian Railways gallery image photo 7Representative Indian Railways gallery image photo 8 1 / 8
Representative gallery slideshow

55517 Darbhanga - Jaynagar Passenger route overview

Departure
DBG
DARBHANGA JN
18:15
Arrival
JYG
JAYNAGAR
20:55
2 hr 40 minDuration
68 kmDistance
25 km/hAvg speed
15Stops

55517 Darbhanga - Jaynagar Passenger runs from DARBHANGA JN (DBG) to JAYNAGAR (JYG), covering 68 km in approximately 2 hr 40 min. It operates on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

Rake & maintenance
ICF · 20 coaches · 2 rakes PM: JYG (ECR)
Travel classes
GEN
Runs on
MonTueWedThuFriSatSun
Running
Of 29 Aug, has arrived at Jaynagar at 22:14 (1 hr 19 min late).
Usually hauled by WAP4 / Samastipur
7 observed runs
WAP4 locomotive

55517 coach composition

PLANNED
20 Coaches
0
L
1
GEN
2
GEN
3
GEN
4
GEN
5
GEN
6
GEN
7
GEN
8
GEN
9
GEN
10
GEN
11
GEN
12
GEN
13
GEN
14
GEN
15
GEN
16
GEN
17
GEN
18
GEN
19
SLRD
20
SLRD

55517 route and timetable

15 halts · 1 non-stop stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
DARBHANGA JN (DBG)
18:15 Avg 58 min late · 11 runs
Pf*
0 km
KAKARGHATTI JUNCTION (KKHT)
18:27 - 18:29 Avg 58 min late · 11 runs
Pf1*
06.84 km
BIJULI HALT [D] (BJIH)
18:34 - 18:35
Pf1*
09.88 km
TARSARAI (TRS)
18:40 - 18:45 Avg 1 hr 13 min late · 10 runs
Pf2*
12.86 km
SHAEED SURAJ NARYAN SINGH [D] (SSNS)
18:50 - 18:51
Pf1*
16.08 km
SAKRI JN (SKI)
18:56 - 18:58 Avg 1 hr 9 min late · 11 runs
Pf1*
19.29 km
UGNA HALT [D] (UGNA)
19:04 - 19:05
Pf1*
23.77 km
PANDAUL (PDW)
19:10 - 19:12 Avg 1 hr 15 min late · 11 runs
Pf1*
27.36 km
SALEMPUR HALT [D] (SPRN)
19:17 - 19:18
Pf1*
30.83 km
MADHUBANI (MBI)
19:24 - 19:26 Avg 1 hr 24 min late · 10 runs
Pf1*
36.21 km
1 non-stop station · 10.1 km at 30 km/hr
RAJNAGAR (RJA)
19:46 - 19:51 Avg 1 hr 19 min late · 12 runs
Pf1*
46.27 km
LALIT LAKSHMIPUR [D] (LLPR)
19:57 - 19:58
Pf1*
50.40 km
KHAJAULI (KJI)
20:04 - 20:25 Avg 1 hr 21 min late · 12 runs
Pf1*
55.52 km
KORAHIA [D] (KRHA)
20:31 - 20:32
Pf1*
60.98 km
JAYNAGAR (JYG)
20:55
Pf1*
67.98 km

Review 55517 Darbhanga - Jaynagar Passenger

Help other passengers with an honest, useful journey review.

3.8
10 traveller reviews

Ratings are submitted by RailJournal travellers.

Choose your rating

Traveller experiences

Recent feedback from the RailJournal community.

10 total
Akash · 5.0 1 day ago
Vikrant Singh Panwar · 4.0 1 day ago
Baljeet Singh · 5.0 1 day ago

The ride aboard the Darbhanga - Jaynagar Passenger (55517) was comfortable overall. Checking the platform and coach position before departure made boarding easier.

Sameer · 3.0 1 day ago
Dishad · 3.0 2 days ago
Balraj · 1.0 3 days ago
Sh Birma · 4.0 3 days ago

The Darbhanga - Jaynagar Passenger (55517) has useful timings between DBG and JYG. Carrying water and a light meal is still a good idea.

Venkatswaran Rama Swamy · 5.0 3 days ago

Train FAQs

What is the schedule of Darbhanga - Jaynagar Passenger (55517)?

Darbhanga - Jaynagar Passenger (55517) runs from DARBHANGA JN to JAYNAGAR. Check the timetable above for every scheduled stop.

What is the route of Darbhanga - Jaynagar Passenger (55517)?

Darbhanga - Jaynagar Passenger (55517) connects DARBHANGA JN and JAYNAGAR. The complete stop-by-stop route is listed in the timetable above.

On which days does Darbhanga - Jaynagar Passenger (55517) run?

Darbhanga - Jaynagar Passenger (55517) runs on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

What is the coach composition of Darbhanga - Jaynagar Passenger (55517)?

The composition section above shows 20 coaches for Darbhanga - Jaynagar Passenger (55517).