Indian Railways train

64012 Shakurbasti - Palwal EMU

शकूरबस्ती - पलवल ईएमयू
TypeElectric Multiple Unit
RailwayNR
Return64011
Representative Indian Railways gallery image photo 1Representative Indian Railways gallery image photo 2Representative Indian Railways gallery image photo 3Representative Indian Railways gallery image photo 4Representative Indian Railways gallery image photo 5Representative Indian Railways gallery image photo 6Representative Indian Railways gallery image photo 7Representative Indian Railways gallery image photo 8 1 / 8
Representative gallery slideshow

64012 Shakurbasti - Palwal EMU route overview

Departure
SSB
SHAKURBASTI
10:00
Arrival
PWL
PALWAL
12:10
2 hr 10 minDuration
69 kmDistance
32 km/hAvg speed
16Stops

64012 Shakurbasti - Palwal EMU runs from SHAKURBASTI (SSB) to PALWAL (PWL), covering 69 km in approximately 2 hr 10 min. It operates on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

Rake & maintenance
EMU · 12 coaches · 6 rakes PM: CYZ (NR)
Travel classes
GEN
Runs on
MonTueWedThuFriSatSun
Running
Of 31 Aug, has arrived at Palwal at 13:00 (50 min late).
Scheduled link Locomotive link
Open live map

64012 coach composition

PLANNED
12 Coaches
0
L
1
GEN
2
GEN
3
GEN
4
GEN
5
GEN
6
GEN
7
GEN
8
GEN
9
GEN
10
GEN
11
GEN
12
GEN

64012 route and timetable

16 halts · 1 non-stop stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
SHAKURBASTI (SSB)
10:00
Pf6
0 km
DAYABASTI (DBSI)
10:06 - 10:07 Avg 15 min late · 12 runs
Pf1
04.30 km
VIVEKANAND PURI HALT [D] (VVKP)
10:09 - 10:10
Pf*
05.69 km
DELHI KISHANGNJ (DKZ)
10:18 - 10:19 Avg 18 min late · 12 runs
Pf1
07.24 km
SADAR BAZAR [D] (DSB)
10:25 - 10:26
Pf*
09.73 km
NEW DELHI (NDLS)
10:38 - 10:40 Avg 38 min late · 13 runs
Pf8
11.36 km
SHIVAJI BRIDGE [D] (CSB)
10:44 - 10:45
Pf*
12.61 km
TILAK BRIDGE (TKJ)
10:48 - 10:49
Pf3
13.98 km
HAZRAT NIZAMUDDIN JN (NZM)
10:55 - 10:56 Avg 49 min late · 13 runs
Pf5
18.61 km
OKHLA (OKA)
11:02 - 11:03 Avg 58 min late · 10 runs
Pf3
22.27 km
TUGLAKABAD (TKD)
11:10 - 11:11
Pf1
29.12 km
1 non-stop station · 10.3 km at 62 km/hr
FARIDABAD (FDB)
11:21 - 11:22 Avg 1 hr 11 min late · 12 runs
Pf1
39.41 km
FARIDABAD NW TN (FDN)
11:27 - 11:28 Avg 1 hr 11 min late · 10 runs
Pf1
43.42 km
BALLABGARH (BVH)
11:33 - 11:34 Avg 1 hr 13 min late · 11 runs
Pf4
47.42 km
ASAOTI (AST)
11:43 - 11:44
Pf4
57.33 km
PALWAL (PWL)
12:10
Pf1A
68.56 km

Review 64012 Shakurbasti - Palwal EMU

Help other passengers with an honest, useful journey review.

No written reviews yet

Be the first traveller to share useful details.

Choose your rating

Traveller experiences

Recent feedback from the RailJournal community.

No traveller stories yetShare the first review for this train.

Train FAQs

What is the schedule of Shakurbasti - Palwal EMU (64012)?

Shakurbasti - Palwal EMU (64012) runs from SHAKURBASTI to PALWAL. Check the timetable above for every scheduled stop.

What is the route of Shakurbasti - Palwal EMU (64012)?

Shakurbasti - Palwal EMU (64012) connects SHAKURBASTI and PALWAL. The complete stop-by-stop route is listed in the timetable above.

On which days does Shakurbasti - Palwal EMU (64012) run?

Shakurbasti - Palwal EMU (64012) runs on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

What is the coach composition of Shakurbasti - Palwal EMU (64012)?

The composition section above shows 12 coaches for Shakurbasti - Palwal EMU (64012).