Indian Railways train

64633 Gwalior - Etawah MEMU

ग्वालियर - इटावा मेमू
TypeMainline Electric Multiple Unit
RailwayNCR
Return64634
Representative Indian Railways gallery image photo 1Representative Indian Railways gallery image photo 2Representative Indian Railways gallery image photo 3Representative Indian Railways gallery image photo 4Representative Indian Railways gallery image photo 5Representative Indian Railways gallery image photo 6Representative Indian Railways gallery image photo 7Representative Indian Railways gallery image photo 8 1 / 8
Representative gallery slideshow

64633 Gwalior - Etawah MEMU route overview

Departure
GWL
GWALIOR JN.
17:30
Arrival
ETW
ETAWAH JN
21:30
4 hr 00 minDuration
118 kmDistance
30 km/hAvg speed
17Stops

64633 Gwalior - Etawah MEMU runs from GWALIOR JN. (GWL) to ETAWAH JN (ETW), covering 118 km in approximately 4 hr 00 min. It operates on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

Rake & maintenance
MEMU · 8 coaches · 6 rakes PM: CNB (NCR)
Travel classes
GEN
Runs on
MonTueWedThuFriSatSun
Running
Of 29 Aug, has arrived at Etawah Jn at 21:22 (On Time).
Scheduled link Locomotive link
Open live map

64633 coach composition

CURRENT
8 Coaches
0
L
1
GEN
2
GEN
3
GEN
4
GEN
5
GEN
6
GEN
7
GEN
8
GEN

64633 route and timetable

17 halts · 0 non-stop stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
GWALIOR JN. (GWL)
17:30 Avg 1 min late · 12 runs
Pf3*
0 km
BIRLANAGAR (BLNR)
17:37 - 17:38 Avg 8 min late · 12 runs
Pf3*
02.84 km
BHADROLI [D] (BBY)
17:48 - 17:49
Pf*
11.63 km
SANICHARA (SAC)
17:57 - 17:59 Avg 9 min late · 11 runs
Pf1*
18.03 km
RETHORAKALAN [D] (RAKL)
18:06 - 18:07
Pf*
22.47 km
MALANPUR (MLAR)
18:13 - 18:20 Avg 8 min late · 12 runs
Pf1*
25.47 km
NONERA [D] (NNE)
18:28 - 18:29
Pf*
31.22 km
RAYAT PURA [D] (RYT)
18:35 - 18:36
Pf*
34.64 km
GOHAD ROAD (GOA)
18:45 - 18:47 Avg 6 min late · 11 runs
Pf1*
42.42 km
SONDHA ROAD [D] (SCN)
18:56 - 18:57
Pf*
50.67 km
SONI (SONI)
19:06 - 19:32 Avg 7 min late · 11 runs
Pf1*
58.17 km
ASOKHAR [D] (AXK)
19:40 - 19:41
Pf*
64.70 km
ITEHAR [D] (AAH)
19:49 - 19:50
Pf*
71.02 km
BHIND (BIX)
20:23 - 20:25 Avg 13 min early · 12 runs
Pf1*
81.93 km
PHOOP [D] (PHOP)
20:37 - 20:38
Pf*
93.81 km
UDI MOR JN (UDMR)
21:08 - 21:10 Avg 18 min early · 11 runs
Pf1*
105.69 km
ETAWAH JN (ETW)
21:30
Pf1*
118.35 km

Review 64633 Gwalior - Etawah MEMU

Help other passengers with an honest, useful journey review.

No written reviews yet

Be the first traveller to share useful details.

Choose your rating

Traveller experiences

Recent feedback from the RailJournal community.

No traveller stories yetShare the first review for this train.

Train FAQs

What is the schedule of Gwalior - Etawah MEMU (64633)?

Gwalior - Etawah MEMU (64633) runs from GWALIOR JN. to ETAWAH JN. Check the timetable above for every scheduled stop.

What is the route of Gwalior - Etawah MEMU (64633)?

Gwalior - Etawah MEMU (64633) connects GWALIOR JN. and ETAWAH JN. The complete stop-by-stop route is listed in the timetable above.

On which days does Gwalior - Etawah MEMU (64633) run?

Gwalior - Etawah MEMU (64633) runs on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

What is the coach composition of Gwalior - Etawah MEMU (64633)?

The composition section above shows 8 coaches for Gwalior - Etawah MEMU (64633).